MTB Metals closes $2.03M final tranche of placement

Jun 13, 2023

2023-06-12 19:24 ET – News Release   Mr. Lawrence Roulston reports MTB METALS CLOSES SECOND AND FINAL TRANCHE OF PRIVATE PLACEMENT, RAISING TOTAL OVER $2 MILLION MTB Metals Corp. has closed the second and final tranche of the non-brokered private placements for flow-through and non-flow-through units, as announced on May 4. The two tranches total $2,031,991. The funds will be used primarily for exploration on MTB Metals’ Telegraph property in the Golden Triangle of British...

read more

Avrupa drills 26.95 m of 2.18% Cu at Alvalade

Jun 13, 2023

2023-06-12 11:47 ET – News Release   Mr. Paul Kuhn reports AVRUPA MINERALS INTERSECTS 26.95 METERS @ 2.18% COPPER, 2.58% LEAD, 5.60% ZINC, AND 88.2 PPM SILVER AT SESMARIAS, PORTUGAL Avrupa Minerals Ltd. has provided new assay results from the Sesmarias massive sulphide target area, Alvalade joint venture project, Portugal. The program is a joint venture between Avrupa Minerals and Minas de Aguas Tenidas SA (Sandfire MATSA). Avrupa continues to operate the project through the JV...

read more

Cullinan Metals closes $250,000 private placement

Jun 13, 2023

2023-06-13 09:09 ET – News Release   Mr. Marc Enright-Morin reports CULLINAN METALS ANNOUNCES CLOSING OF FLOW-THROUGH PRIVATE PLACEMENT Cullinan Metals Corp., further to its news release dated June 7, 2023, has closed a non-brokered private placement of 625,000 flow-through (FT) units at a price of 40 cents per flow-through unit for gross proceeds of up to $250,000. Each FT unit comprises (a) one flow-through common share that will qualify as flow-through shares within the meaning of...

read more

Tocvan Announces Favorable Gold and Silver Values in Bulk Sample Progress Report Updates on Latest Results as Heap Leach Continues

Jun 13, 2023

Tocvan Ventures Corp. is pleased to provide an update and sampling results from a Bulk Sample being completed at its Pilar gold-silver project in Sonora, Mexico. The Company’s field management and technicians remain active with the heap leach process ongoing for the Bulk Sample. Over 800 tonnes of material are being processed through heap leach, an additional 350 tonnes of crushed material and 250 tonnes of raw-bulk sample are available for gravity recovery and later agitated leach...

read more

Golden Arrow Drills 34m of 0.41% Copper and 466g/t Cobalt at First Exploration Target, San Pietro IOCG Project, Chile

Jun 13, 2023

Golden Arrow Drills 34m of 0.41% Copper and 466g/t Cobalt at First Exploration Target, San Pietro IOCG Project, Chile Vancouver, BC / CNW / June 13, 2023 / Golden Arrow Resources Corporation (TSX-V: GRG, FSE: G6A, OTCQB: GARWF), (“Golden Arrow” or the “Company”) is pleased to report the first results from the Phase 1 diamond drilling program at the Company’s flagship San Pietro Iron-Copper-Gold-Cobalt Project in Chile. These first results from two completed...

read more