Treasury Metals Reports Additional Main and C Zone Results – Includes 13 metres at 3.13 g/t Au and 1 metre at 430 g/t Au
TORONTO, March 18, 2013 /CNW/ – Treasury Metals Inc. is reporting additional drilling results from the Main and C Zones of the Company’s flagship Goliath Gold Project located in northwestern Ontario. The C Zone mineralisation is located approximately 30 to 50 metres behind the Project’s Main Zone of mineralization. Holes TL13-300 and TL13-311 were drilled in the eastern sector of the proposed open pit whereas the 4 remaining holes were drilled in the western sector at relatively shallow depths except for TL13-314 which intersected the C Zone at approximately 225m below the surface.
The results reported today include near surface intersections of 13 metres at 3.13 g/t Au from 79.5 meters depth (C Zone) in drill hole TL13-300 and 1 metre at 430 g/t Au from 16.7 metres depth in drill hole TL13-320.Ā The latter intersection, which highlights the higher grade zones of the deposit, was a Main Zone intercept with multiple flecks of visible gold that occurred in thin pyrite-rich laminae with sphalerite and galena in the host muscovite-sericite schist.