ORIGINAL: Power Nickel Hole 78 Delivers over 29.5 Metres Wide Polymetallic Zone with Grades ranging from 2.3% – 11% CuEq
2024-12-18 08:59 ET – News Release Power Nickel Hole 78 Delivers over 29.5 Metres Wide Polymetallic Zone with Grades ranging from 2.3% – 11% CuEq PR Newswire TORONTO, Dec. 18, 2024 TORONTO, Dec. 18, 2024 /PRNewswire/ – Power Nickel Inc. (the “Company” or “Power Nickel”) (TSXV: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce the return of the first 2 holes of the fall campaign. Hole PN-24-076 reported no material results....
read more