Nubian begins diamond drilling at Yandoit

Aug 6, 2021

2021-08-06 08:06 ET – News Release

 

Mr. Martin Walter reports

NUBIAN BEGINS DIAMOND DRILLING AFTER COMPLETING MAIDEN RC DRILLING PROGRAM AT ITS YANDOIT GOLD PROJECT, VICTORIA, AUSTRALIA

Through Ballarat Investment Project Management Pty. Ltd. (BIPM), a controlled subsidiary of the company, Nubian Resources Ltd. has completed an initial reverse circulation (RC) drilling program at its Yandoit gold project and across exploration licence 5193 (or EL5193) located in the central goldfields of Victoria, Australia. The company has now deployed a diamond drilling rig at the project capable of drilling deeper diamond core.

The RC drilling program was designed to test near-surface targets demonstrated as being prospective from either reconnaissance soil sampling or shallow historic mining with a notable gold production history. A total of 20 holes for a total of 1,164 RC metres were drilled from four project locations. Geological logging of the RC chips shows the drilling intersected numerous quartz reefs down hole that vary from around one metre to several metres in width. The reefs near surface are completely weathered, however, textural evidence demonstrates that some quartz fragments exhibit weathered sulphide mineralization. Pyrite alteration existing as a halo is found surrounding many quartz intersections, a common feature of mesothermal gold deposits in central Victoria. Approximately 276 metres of drilling were logged as containing equal to or greater than 20 per cent quartz, and approximately 132 metres were logged as containing 80 per cent or greater quartz. Assays are now pending for all holes and results will be announced when the assays are received and reviewed by the company. All information gathered is expected to be utilized by the company to build a geochemical and structural model for the Yandoit goldfield to better manage further regional exploration efforts.

The company anticipates that the results of the RC drilling program will provide a greater understanding of gold endowments and distribution in EL5193 and throughout the Yandoit Goldfield, and the associated mineralization of related elements, including controlling fault geometries and their relationships with host lithology. The preliminary results are expected to be integrated with the upcoming diamond drilling data.

Martin Walter, president and chief executive officer, stated: “Pending release of initial results from the assay laboratory, the company considers these qualitative results to date as highly encouraging and recognizes this initial campaign as being productive despite difficult conditions of protracted rain throughout Victoria, with 2021 being one of the wettest winters in more than 10 years.”

The company plans to commence diamond drilling in the coming week beneath the historic Golconda mine. Historic reports indicate that gold was produced across a long and punctuated mining history, believed to be sourced from a quartz lode up to 10 metres wide, with narrower widths worked within the bulged quartz lode shoot. Target generation is dynamic, with the diamond drill capable of drilling to depths of 500 metres, allowing testing below historic workings.

The diamond drill program is also expected to drill test below many of quartz reefs that were intersected in the just completed shallow RC program. A total of up to 2,000 metres of core drilling have been planned for this initial phase. For additional information, including photos, plans and geological sections of the drilling program please refer to the company website.

The company also announces that the transfers of the adjacent EL6274 and mining licence (MIN5503) to BIPM are still waiting final authorization from Earth Resources Regulation, Department of Jobs, Precincts and Regions. The appropriate paperwork to facilitate the transfers was filed with Earth Resources Regulation in 2020, however approvals for these transfers are still pending, due in part to the original licenceholder having been placed into administration, an event beyond the company’s control, which has resulted in an extended review process by Earth Resources Regulation. There is no certainty as to when or if the required approvals for the transfer of these licences will be obtained. Accordingly, there is a risk that the transfers will not be completed in a timely manner or at all. The company is working diligently with all relevant parties to assist with the review process with a view to obtaining the necessary Earth Resources Regulation approvals for the licence transfers. Until such time as these transfers occur, the company is not able to conduct exploration or drilling programs in the areas covered by these licences. As a result, the current drilling program is proceeding solely on EL5193 for now. If, ultimately, the transfers of one or both of the tenements are not approved by Earth Resources Regulation, the company will assess its options for appeal and exercise its rights, as provided for in the purchase agreement, to reduce the outstanding consideration payable in relation to the acquisition of the licences.

Qualified person

The technical information contained in this news release relating to the Yandoit gold project has been approved by Mark Saxon, an adviser to Nubian, who is a qualified person within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects. Mr. Saxon is an honours BSc graduate in geology from the University of Melbourne, a fellow of the Australasian Institute of Mining and Metallurgy, and a member of the Australian Institute of Geoscientists.

About Nubian Resources Ltd.

Nubian Resources is a publicly traded precious and base metals exploration company listed on the TSX Venture Exchange. The company is managed by a team of experienced mining and geological professionals. Nubian’s projects are focused in key mining jurisdictions in central Victoria and Tasmania, Australia and Peru.

We seek Safe Harbor.

https://www.nubianr.com/

Related Posts

Tags

Share This