Century Lithium produces 14 g/L Li at pilot plant
2023-12-11 09:22 ET – News Release
Dr. William Willoughby reports
CENTURY LITHIUM REPORTS PROGRESS AT ITS LITHIUM EXTRACTION FACILITY IN NEVADA
Century Lithium Corp. has provided an update on progress and further developments at its lithium extraction facility (pilot plant) in Amargosa Valley, Nevada.
Highlights:
- Further process improvements implemented at the pilot plant, resulting in lithium grades consistently exceeding 14 grams/litre in the intermediate solutions produced (up from 7.5 grams/litre reported in August, 2023);
- Pilot plant tests continuing, completing 23 months of safe operation;
- Work with Koch Technology Solutions LLC (KTS) on direct lithium extraction (DLE) is continuing; delivering repeatable results and exceeding expectations;
- KTS to complete commercial design of a DLE installation for the project in January, 2024.
On Aug. 9, 2023, the company reported achieving an increase of lithium grades in the intermediate solutions produced at the pilot plant to the highest levels to date, with an average grade of 7.5 grams/litre lithium. This increase in concentration was attributed to the integration of Koch Technology Solutions Li-Pro equipment into the DLE area. In mid-August, the company added an osmotically assisted reverse osmosis (OARO) unit downstream of the DLE area. With the OARO unit in operation at the pilot plant, Century has consistently achieved lithium grades exceeding 14 grams/litre in its intermediate solutions, accompanied by significantly reduced levels of impurities.
Century’s collaboration with KTS continued to produce exceptional results within the DLE area of the pilot plant. With nearly 3,000 operating cycles of the equipment completed since its installation in April, 2023, results have exceeded target levels for both lithium extraction and rejection of impurities from leach solutions. With these positive results, the company anticipates KTS completing its commercial design of a DLE installation for the project in January, 2024.
Century’s team continues to innovate and improve its process flowsheet for the project through testing equipment, reagents and alternative configurations of its flowsheet at the pilot plant. This work will continue into the coming year as the pilot plant generates data to support and further derisk the project and addresses recommendations identified during the feasibility study.
Qualified person
Todd Fayram, MMSA, qualified person and senior vice-president, metallurgy, of Century Lithium, is the qualified person as defined by National Instrument 43-101 and has approved the technical information in this release.
About Century Lithium Corp.
Century Lithium (formerly Cypress Development Corp.) is an advanced-stage lithium company, focused on developing its 100-per-cent-owned Clayton Valley lithium project in west-central Nevada, United States. Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its lithium extraction facility in Amargosa Valley, Nevada, and progressing toward completing a feasibility study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.