Century Lithium: Investor Newsletter – Upcoming Events | Media Appearances | News

Jun 3, 2024

With last month’s announcement of Century Lithium’s Feasibility Study (FS) results on the Clayton Valley Lithium Project, the team has been busy sharing the Project’s highlights across the globe.

The Clayton Valley Lithium Project is a large-scale Nevada-based Lithium Project, with a +40-year mine life and has a three-phase production plan that will generate a life-of-mine average of 34,000 tonnes per annum of battery-quality lithium carbonate.

In addition, the FS outlined that the Project’s OPEX, after sales of surplus sodium hydroxide (NaOH), a by-product of the chlor-alkali plant, boasts one of the lowest operating cost in North America.

The next steps for the Company are to complete the Plan of Operation, advance permitting, examine ways to optimize power requirements and incorporate alternative energy solutions – and attract a strategic partner.

Century will continue engaging with governmental agencies and other parties and proceeding with detailed engineering to further advance the Project.

If you have any questions, please feel free to reply to this email or reach out to us directly at +1 604 764 1851.

FEASIBILITY STUDY HIGHLIGHTS

  • Large-Scale Nevada-based Lithium Project: three-phase production plan will generate a life-of-mine average of 34,000 tonnes per annum (tpa) of battery-quality lithium carbonate (Li2CO3)
  • Innovative Approach in Processing: patent-pending chloride leaching process combined with Direct Lithium Extraction (DLE), the Feasibility Study is supported by 2+ years of testing at the Company’s Pilot Plant
  • Mineral Resource Estimate: Measured and Indicated resources totaling 1,207.33 million tonnes (Mt) at an average grade of 957 parts per million (ppm) lithium (Li) containing 1.155 Mt of Li or 6.148 Mt of lithium carbonate equivalent (LCE)
  • Long 40-Year Mine Life: Proven and Probable Mineral Reserve Estimate totaling 287.65 Mt at an average grade of 1,149 ppm Li containing 0.330 Mt of lithium or 1.759 Mt of LCE
  • Initial Project: Phase 1 Capital Cost $1.537 billion for production capacity of 13,000 tpa LCE
  • Designed for Expansion: Phase 2 $0.651 billion for 28,000 tpa LCE, and Phase 3 $1.336 billion for 41,000 tpa LCE; Project expansions are capitalized with Project cash flow
  • Low Operating Cost: average operating cost $8,223/t of Li2CO3 produced, or $2,766/t after sales of surplus sodium hydroxide (NaOH)
  • After-tax IRR of 17.1% at $24,000/t Li2CO3$3.01 billion after-tax net present value (NPV) at 8% discount rate and a 17.1% after-tax internal rate of return (IRR), using price assumptions of $24,000/t for Li2COand $600/dry metric tonne (dmt) for NaOH
121 Group | June 3-4, 2024
121MINING INVESTMENT NEW YORK
LEARN MORE
Benchmark | June 11-13, 2024
GIGA USA 2023
LEARN MORE
121 Group | June 12-13, 2024
121 GLOBAL ONLINE
LEARN MORE
Fastmarkets | June 24-27, 2024
16th LITHIUM SUPPLY AND BATTERY RAW MATERIALS CONFERENCE 2024
LEARN MORE
Precious Metals Summit Conferences, LLC | September 10-13, 2024
2024 PRECIOUS METALS SUMMIT BEAVER CREEK
LEARN MORE
121 Group | November 14-15, 2024
121 MINING INVESTMENT LONDON
LEARN MORE
SMI | November 20-21, 2024
SWISS MINING INSTITUTE INVESTMENT CONFERENCE
LEARN MORE
Swiss Resource Capital AG | May 13, 2024
CENTURY LITHIUM: POSITIVE FEASIBILITY STUDY WITH 3 PHASES OF PRODUCTION FOR US BASED LITHIUM PROJECT
WATCH HERE
Swiss Resource Capital AG | May 6, 2024
CENTURY LITHIUM: CEO ON POSITIVE FEASIBILITY STUDY AND WHAT’S COMING NEXT
WATCH HERE
6ix | April 29, 2024
CENTURY LITHIUM ANNOUNCES POSITIVE FEASIBILITY STUDY
WATCH HERE
Proactive Investors | April 29, 2024
CENTURY LITHIUM UNVEILS ROBUST FEASIBILITY STUDY RESULTS FOR CLAYTON VALLEY LITHIUM PROJECT
WATCH HERE
April 29, 2024
CENTURY LITHIUM ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE CLAYTON VALLEY LITHIUM PROJECT, NEVADA
READ HERE
April 19, 2024
CENTURY LITHIUM PROVIDES UPDATE ON THE FEASIBILITY STUDY
READ HERE
December 11, 2023
CENTURY LITHIUM REPORTS PROGRESS AT ITS LITHIUM EXTRACTION FACILITY IN NEVADA
READ HERE
December 6, 2023
CENTURY LITHIUM PROVIDES UPDATE ON FEASIBILITY STUDY AND SODIUM HYDROXIDE AS A BY-PRODUCT
READ HERE
VIEW OUR CORPORATE PRESENTATION

https://centurylithium.com/

Related Posts

Tags

Share This