Arizona Gold & Silver Infill Drilling Intersects 90.71 Metres at 1.45 g/t Gold, Including 9.94 Metres at 5.58 g/t Gold, at the Philadelphia Project
Arizona Gold & Silver Infill Drilling Intersects 90.71 Metres at 1.45 g/t Gold, Including 9.94 Metres at 5.58 g/t Gold, at the Philadelphia Project, Arizona Deeper drilling underway Assays pending from two holes testing the down-dip continuation of the high-grade Perry Zone Vancouver, British Columbia, September 8, 2026 – Arizona Gold & Silver Inc. (“Arizona” or the “Company”) (TSXV: AZS) (OTCQB: AZASF) is...
read more



















