Kestrel Gold completes RC drilling program at Grabben

Jun 15, 2021

2021-06-15 13:47 ET – News Release   Mr. Rob Solinger reports KESTREL GOLD – COMPLETES DRILLING AT GRABBEN Kestrel Gold Inc.’s previously reported reverse circulation drill program (see the corporation’s May 25, 2021, news release) has been completed, resulting in nine holes totalling 557.9 metres of drilling. All holes encountered sections of variably clay altered, bleached, limonitic and fractured intrusive as well as sedimentary units. Portable X-Ray Fluorescence...

read more

Ceylon Graphite acquires licence for graphene tech

Jun 15, 2021

2021-06-14 10:13 ET – News Release   Mr. Don Baxter reports CEYLON GRAPHITE ANNOUNCES LICENCE FOR VEIN GRAPHITE AND GRAPHENE TECHNOLOGIES Ceylon Graphite Corp. has acquired an exclusive global licence from Cambridge Advanced Materials & Innovation. The licence pertains to a method of producing high-quality few-layer graphene (FLG) and derivatives by exfoliation of high-grade vein graphite produced by Ceylon Graphite (the technology). This is a low-energy process which results in...

read more

Surge Copper drills 432 m of 0.61% CuEq at Ootsa

Jun 15, 2021

2021-06-15 07:52 ET – News Release   Mr. Leif Nilsson reports SURGE COPPER INTERSECTS 432 METRES OF 0.61% CUEQ AND 506 METRES OF 0.43% CUEQ IN FINAL WINTER DRILLING RESULTS FROM WEST SEEL Surge Copper Corp. has released assay results for multiple resource definition and exploration holes from the company’s 100-per-cent-owned Ootsa property in British Columbia. Highlights:   Hole S21-243 intersected 432 metres grading 0.61 per cent copper equivalent, including 156 metres...

read more

Tocvan drills 35.1 m of 0.72 g/t AuEq at Pilar

Jun 15, 2021

2021-06-15 06:07 ET – News Release Also News Release (C-CBI) Colibri Resource Corp (2) Mr. Derek Wood of Tocvan Ventures reports TOCVAN DRILLS 35.1 METERS OF 0.72 G/T AUEQ IN 100 METER STEP-OUT EAST OF THE MAIN ZONE AT PILAR Tocvan Ventures Corp. has released the results for the next four drill holes from its phase 2 drill program at the Pilar gold-silver project in Sonora, Mexico. A phase 2 drill program is currently in progress with 3,500 metres of reverse circulation (RC) drilling in...

read more

Western Magnesium Closes Private Placement of Convertible Debenture

Jun 15, 2021

Western Magnesium Closes Private Placement of Convertible Debenture NOT FOR DISTRIBUTION TO UNITED STATES NEWS SERVICES OR FOR DISSEMINATION IN THE UNITED STATES NEW YORK, NY – TheNewswire – June 15, 2021 – Western Magnesium Corporation (TSXV:WMG; Frankfurt-3WM; OTCQB:MLYF) (“Western Magnesium” or the “Company”) is pleased to announce a significant investment into the Company of US$1,500,000 for the continuing...

read more